Monday, September 5, 2016

PHASE1 : SCHOOL FOR THE BLIND AND GYMNASIUM


SCHOOL FOR THE BLIND


SCHOOL FOR THE BLIND - THE PREVIOUS VERSION, THE SCHOOL IS ESSENTIAL A TWO-FLOOR BOX ON PILOTIS, PERFORATED WITH OPENINGS, EXPOSED TO THE SKELETON WITHIN OR ARRAYED BEHIND THE BRISES-SOLEIL, AND ARRANGED IN SHAPES AND ANGLES TO CATCH THE WIND. NOW, THERE ARE ADD MORE PARTITIONS TO APPLY WITH THE NUMBER OF BLIND CHILDREN AND TEACHERS. AND BECAUSE OF THE FRONT SIDE HAVE MANY BUILDINGS POPS UP, THOSE SKELETON ALSO BE CUT OFF. 

THIS IS ONE OF THE CUT-COST SYSTEM BUILDINGS. THE WHOLE STRUCTURAL FRAME-GIRDERS, BEAM, FLOOR UNITS AND COLUMNS- WAS TRANSPORTED IN PIECES AND ASSEMBLED ON THE SITE.


GYMNASIUM


GYMNASIUM, THE SPORT TRAINING CENTER - THE TWO HALLS ARE HOUSED WITHIN A LARGE FOLDED-PLATE STRUCTURE CONSISTING OF PRECAST CONCRETE ELEMENTS. THE STRUCTURE ENCLOSES THE OUTSTANDING ON-SITE BUILDING VOLUME OF 80M LENGTH AND 55M WIDTH AT THE SAME NATURAL GROUND; A GREAT VIEW IS SEEN THROUGHOUT THE LANDSCAPE. ROOM ISOLATION IS CARRIED OUT UNDER THE ROOF BEAMS RESPECTIVELY ON THE LINING IS AT THE FRAMEWORK WITH THE GLASS FACADE. 

MODULAR UNITS OF PRECAST CONCRETE ARE CONNECTED BY USING STEEL BAR INSIDE. THE STEEL BAR IS ALONG TO MODULAR SHAPES AND CONNECT EVERY CHANGED SHAPES. SPENDING SHORT TIME AND LOW COST TO ASSEMBLED ON SITE.  

No comments:

Post a Comment